After intense seven month, the test unit has been commissioned with little delay, runs 24/7 and is already delivering the much expected results. The unit is installed in a 5 m long 2.2 m wide and 2.5 m high trailer. A second, smaller trailer connected to the test unit contains the infrastructure which emulates the earth probes.
This is a major step for HyWin. Therefore we replace this webpage with a newly designed website soon, so that we can report regularly on the progress of HyWin.